2022 - Alerts and Outages Notifications

Library Main Doors | Out of service 

Posted December 15, 2022 @ 1:28 p.m.:

The main ADA sliding doors (near Peet’s Coffee) in the Library are out of service until further notice. The doors have been secured and labeled with caution tape. For alternative entry and exit ADA options, please use the doors on the west side basement level, as well as the doors on the south side facing Holloway.

Additional updates will be provided as they are available.

If you have any questions or concerns, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

Weekend Work | Cafe Rosso Tree Removal Saturday, 12/17/22 from 8:00 am - 5:00 pm

Posted December 15, 2022 @ 9:47 a.m.:

Due to safety concerns, please be advised that the Grounds crew is working with a 3rd party contractor (Professional Tree Care) to remove a pine tree near Café Rosso on Saturday 12/17/22 from 8:00 am – 5:00 pm. There will be a small crane, and chipper working around Café Rosso, and the immediate worksite area will be blocked off.  On-campus vehicles will be permitted to pass as needed, and Facilities staff will be on-site supervising the job.   

Please note that Café Rosso will be closed during the times listed above, and there will be some noise as crews work to safely work on removal.  

If you have any questions or concerns, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu

The grounds shop supervisor overseeing this job is Robert Murphy and may be reached at robertnmurphy@sfsu.edu.

The service desk may be reached at facilities@sfsu.edu, or 415-338-1568.

*12/2/22 Update* | Contractor Work | Scheduled Central Plant Outage 

Posted December 2, 2022 @ 2:14 p.m.:

The following message is on behalf of Capital Planning Design and Construction (CPDC).  If you have any questions about this project, please contact CPDC’s Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

Ethnic Studies & Psychology / Gym Update:

  • Contractors have identified the source of the leak and have installed a temporary fix.  Further repairs will be scheduled during winter break to minimize further disruption. 
  • Central heating and hot water to Ethnic Studies & Psychology has been restored. 
  • Central heating and hot water to the GYM has been restored.

We apologize for any inconvenience this may cause and appreciate your patience and understanding.  

If you have any questions or concerns about this project, please contact CPDC Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

*12/1/22 Update* | Contractor Work | Scheduled Central Plant Outage 

Posted December 1, 2022 @ 3:40 p.m.:

The following message is on behalf of Capital Planning Design and Construction (CPDC).  If you have any questions about this project, please contact CPDC’s Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

Ethnic Studies & Psychology / Gym Update:

  • We continue to make on-going efforts to locate the source of the leak and additional troubleshooting is needed.
  • Ethnic Studies & Psychology has hot water available but no central heating.
  • GYM has furnace heat available but no hot water.     

Corporation Yard Update:

  • Central heating to the Corporation Yard has been restored, but further troubleshooting is needed to the hot water system. 
  • Corporation Yard central heating has been restored. No hot water available until further notice. 

Cesar Chavez Student Center Update:

  • Central heating and hot water to CCSC has been restored. 

We apologize for any inconvenience this may cause and appreciate your patience and understanding.  

If you have any questions or concerns about this project, please contact CPDC Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

The Director of Construction and Inspection and the project administrator is Boris Nemirovskiy, who may be reached at borisn@sfsu.edu.

*11/30/22 Update* | Contractor Work | Scheduled Central Plant Outage  

Posted November 30, 2022 @ 4:23 p.m.:

The following message is on behalf of Capital Planning Design and Construction (CPDC).  If you have any questions about this project, please contact CPDC’s Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

Ethnic Studies & Psychology / Gym Update:

  • Facilities discovered an old hot water pipe broke between Ethnic Studies and Psychology and the Gym.  A CPDC emergency sub-contractor will begin excavation work today 11/30/22 through Friday 12/2/22 between 6:00 am – 4:00 pm.  Please note that excavation requires the use of heavy machinery which will produce noise during the times listed above. This urgent repair is necessary to recover the heating system in the Gym and Ethnic Studies buildings. 
  • Ethnic Studies & Psychology and the Gym will continue to have hot water available but no central heating until this repair is completed. 

Corporation Yard Update:

  • Repairs are on-going, with no further updates as of today.   
  • The Corporation Yard will not have any central heating or hot water available until further notice. 

Cesar Chavez Student Center:

  • Further repairs are still needed, but in the meantime, the central heating to the building has been temporarily restored. 
  • Cesar Chavez Student Center will have intermittent heat and hot water will be available until further notice. 

We apologize for any inconvenience this may cause and appreciate your patience and understanding.  

If you have any questions or concerns about this project, please contact CPDC Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

The Director of Construction and Inspection and the project administrator is Boris Nemirovskiy, who may be reached at borisn@sfsu.edu.

*11/29/22 Update* | Contractor Work | Scheduled Central Plant Outage 

Posted November 29, 2022 @ 9:44 a.m.:

The following message is on behalf of Capital Planning Design and Construction (CPDC).  If you have any questions about this project, please contact CPDC’s Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

The campus heat and hot water has been restored to most of the campus, except for the following buildings please note the following exceptions as indicated.

  • Ethnic Studies & Psychology *no heat, hot water only
  • GYM 100, GYM Men’s & Women’s Locker room, GYM Basketball Courts, GYM Swimming Pool *furnace heat only, no hot water
  • Corporation Yard (FS/CPDC, UPD, Parking & Transportation, Shipping & Receiving, Procurement) *no heat, no hot water
  • Cesar Chavez Student Center *no heat, hot water only

CPDC and Facilities are collectively working to fix the remaining issues and we assure the campus community that this is a top priority repair and we will provide further updates as they become available.

We apologize for any inconvenience this may cause and appreciate your patience and understanding. 

If you have any questions or concerns about this project, please contact CPDC Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

 

The Director of Construction and Inspection and the project administrator is Boris Nemirovskiy, who may be reached at borisn@sfsu.edu.

**UPDATE** Contractor Work | Scheduled Central Plant Outage 

Posted November 28, 2022 @ 11:23 a.m.:

The following message is on behalf of Capital Planning Design and Construction (CPDC).  If you have any questions about this project, please contact CPDC’s Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

Facilities is working on re-pressurizing the Central Plant heating loop and we anticipate it will take 24-48 hours before the heat and hot water are restored to certain parts of campus.  

As a reminder, the following list contains buildings and exceptions that were affected by the hot water and central heating outage.  Hot water and central heating services are estimated to be restored in the following locations listed below.

•             Administration

•             Fine Arts

•             Burk Hall

•             CCSC (Hot Water available and Central heating unavailable)

•             Corporation Yard

•             Creative Arts

•             Ethnic Studies & Psychology

•             Fine Arts

•             GYM

•             Student Health Center

•             Hensill Hall (No Hot Water and No Central Heating from the 1st floor – 7th floor)

•             Humanities

•             Library

•             Marcus Hall

•             Mashouf Wellness Center

•             Science

•             Thornton Hall

The following buildings have not been affected by this outage and have access to hot water and central heating services:

•             All Housing Buildings

•             Annex I & Annex II

•             Animal Quarters

•             8th Fl Hensill Hall

•             Business

•             Children’s Campus

•             Early Childhood Education Center

•             Maloney Field | Fieldhouse

•             Student Services Building

•             Thornton Hall Trailers

If you have any questions or concerns about this project, please contact CPDC Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

The Director of Construction and Inspection and the project administrator is Boris Nemirovskiy, who may be reached at borisn@sfsu.edu.

Domestic Cold Water shutdown | Saturday 11/19/22 from 8:00 a.m. - 3:30 p.m.

Posted November 19, 2022 @ 1:11 p.m.:

Facilities Plumbing shop will be exercising several valves across campus to isolate lines for future corrections, on Saturday 11/19/22 from 8:00 am – 3:00 pm.  

The following buildings may experience intermittent domestic cold-water interruptions, and the restrooms will be unavailable during the times listed above.  Please note that the appropriate signage will be posted in advance of this outage.

  • Administration
  • Library
  • Creative Arts
  • Fine Arts
  • Cesar Chavez Student Center

If you have any questions or concerns about the work being performed, please contact Facilities Coordinator, Jason Deang at jdeang@sfsu.edu.

Contractor Work | Scheduled Central Plant Outage | 11/18/22 - 11/25/22

Posted November 14, 2022 @ 4:00 p.m.:

The following message is on behalf of Capital Planning Design and Construction (CPDC).  If you have any questions about this project, please contact CPDC’s Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

CPDC is working with a 3rd party contractor SBAY, to connect a new section of pipe to the heating hot water loop in the Central Plant on Friday, 11/18/22 at 9:00 a.m. The new line is part of a multi-phase project to enhance the campus infrastructure. It will minimize hot water leaks in the future, providing both environmental benefits and energy conservation. As a result, the campus boiler and pumps will be shut down by facilities affecting hot water and central heating in some locations on campus.

CPDC anticipates the central heating and hot water will be restored on Saturday, 11/26/22.

The affected buildings and services are listed below:

No Hot Water and No Central Heating, with exceptions, indicated

•             Administration

•             Fine Arts

•             Burk Hall

•             CCSC (Hot Water available and Central heating unavailable)

•             Corporation Yard

•             Creative Arts

•             Ethnic Studies & Psychology

•             Fine Arts

•             GYM

•             Student Health Center

•             Hensill Hall (No Hot Water and No Central Heating from the 1st floor – 7th floor)

•             Humanities

•             Library

•             Marcus Hall

•             Mashouf Wellness Center

•             Science

•             Thornton Hall

 

The following buildings will not be affected by this outage and will have access to hot water and central heating services:

•             All Housing Buildings

•             Annex I & Annex II

•             Animal Quarters

•             8th Fl Hensill Hall

•             Business

•             Children’s Campus

•             Early Childhood Education Center

•             Maloney Field | Fieldhouse

•             Student Services Building

•             Thornton Hall Trailers

If you have any questions or concerns about this project, please contact CPDC Project Manager Victor Osorio at vosoriom@sfsu.edu or 628-249-5523.

The Director of Construction and Inspection and the project administrator is Boris Nemirovskiy, who may be reached at borisn@sfsu.edu.

*UPDATE* Campus-Wide Audible Fire Alarm Tests | Building Schedule 

Posted November 10, 2022 @ 2:15 p.m.:

After further review with our partners in EHS and the Office of Emergency Services, we have collectively decided that we should treat this test as if it were a real emergency and all occupants must exit the building. If you have any questions about the evacuation process, we recommend following up with OES at oes@sfsu.edu or 415-338-7300.

These tests will be performed in the morning from approximately 7:10 am – 7:45 am, and the schedule for each building is listed below.  

As a reminder the schedule for each building is as follows:

  • Tuesday, 11/15/22 – Thornton Hall
  • Wednesday, 11/16/22 - Hensill Hall
  • Thursday, 11/17/22 - Library
  • Tuesday, 11/22/22 – HSS
  • Wednesday, 11/23/22 – GYM
  • Tuesday, 11/29/22 – Admin 
  • Thursday, 12/1/22 – Burk Hall
  • Tuesday, 12/6/22 – Cesar Chavez Student Center
  • Wednesday, 12/7/22 – SSB
  • Thursday, 12/8/22 – Humanities
  • Tuesday, 12/13/22 – Marcus Hall
  • Wednesday, 12/14/22 – Creative Arts
  • Thursday, 12/15/22 – Mashouf Wellness Center
  • Tuesday, 12/20/22 – Fine Arts
  • Thursday, 12/22/22 – UPD / Corporation Yard 

If you have any questions or concerns, please contact Fire and Life Safety Manager David Abordo at dabordo@sfsu.edu.

Campus-Wide Audible Fire Alarm Tests | Building Schedule 

Posted November 8, 2022 @ 2:18 p.m.:

Campus Electricians will be performing annual audible fire alarm tests from approximately 7:10 am – 7:45 am, in the following buildings listed below.

Please note: Building evacuations will not be necessary during these tests.

Kindly notify all of your building’s Faculty & staff of our tests to avoid any confusion and review the schedule for your respective building.

  • Tuesday, 11/15/22 – Thornton Hall
  • Wednesday, 11/16/22 - Hensill Hall
  • Thursday, 11/17/22 - Library
  • Tuesday, 11/22/22 – HSS
  • Wednesday, 11/23/22 – GYM
  • Tuesday, 11/29/22 – Admin
  • Thursday, 12/1/22 – Burk Hall
  • Tuesday, 12/6/22 – Cesar Chavez Student Center
  • Wednesday, 12/7/22 – SSB
  • Thursday, 12/8/22 – Humanities
  • Tuesday, 12/13/22 – Marcus Hall
  • Wednesday, 12/14/22 – Creative Arts
  • Thursday, 12/15/22 – Mashouf Wellness Center
  • Tuesday, 12/20/22 – Fine Arts
  • Thursday, 12/22/22 – UPD / Corporation Yard

If you have any questions or concerns, please contact Fire and Life Safety Manager David Abordo at dabordo@sfsu.edu.

Library Fire Water Backflow Preventer Replacement | 10/27/22 from 7:00 a.m. - 2:00 p.m.  

Posted October 21, 2022 @ 11:14 a.m.:

This image shows the crane staging areas between Arellano Dr. and Holloway, and on Holloway near the Landscape Learning Laboratory

Facilities Fire & Life Safety Manager David Abordo has scheduled a replacement of two Fire Water Backflow Preventers (BFP) on the south side exterior of the Library located on Holloway Avenue.  The install is scheduled with a 3rd party vendor (The Backflow Guy) on Thursday, October 27, 2022, from 7:00 am to 2:00 pm.

Please be advised there will be a small lift staged in the following locations:

  • Library loading dock driveway from 7:00 am – 10:00 am. Limited access to the loading dock will be permitted. 
  • Between the Administration building and the Library from 10:00 am – 2:00 pm.

David and Facilities trades are working with the City of San Francisco, to shut the water down to each BFP one at a time to allow for replacement, and we estimate it will take approximately 3 hours to replace each BFP. 

While this work is being completed, we do not anticipate any utility interruptions inside the Library.  Additionally, the Library will be on Fire Watch, and the staff assigned will be inspecting every floor at 30 minute intervals and logging their findings.  Campus electricians will bypass the sprinkler system on the fire alarm panel, and the Library will have full fire alarm protection while the BFP’s are being replaced.    

If you have any questions or concerns about this work, please contact Fire & Life Safety Manager David Abordo at dabordo@sfsu.edu.

HSS Building - Central Heating Update 

Posted October 20, 2022 @ 1:32 p.m.:

Vendor Belfor removed the drop ceiling and contained all hazardous materials on the 3rd floor hallway of HSS. Once all affected materials were removed, MS-Testing completed the air quality test, which reported back as safe.  Campus BSE trades staff were able to repair the leaking section of pipe.  After charging the heating system, an additional leak was discovered on the 1st floor of HSS.

Belfor will remove a small portion of the ceiling near the leak site on the 1st floor, to provide access to the pipes above on Friday, 10/21/22.    

Please note that there will be a few offices affected, and Facilities is working directly with Building Coordinator Samantha Ward, who will reach out to the occupants of these spaces to make further arrangements. 

Additional updates will be provided as they are available, and we greatly appreciate your patience and understanding as Facilities works on these repairs. 

If you have any questions or concerns, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

HSS Building - Central Heating Update 

Posted October 11, 2022 @ 3:42 p.m.:

Facilities has scheduled abatement with a 3rd party vendor Belfor for Monday, 10/17/22 at 7:00 am. Belfor will start the abatement process on the 3rd floor hallway of HSS by installing containment sheets, and air monitoring devices.  This processes includes dropping the ceiling lid, and removing and testing all material.  We anticipate the abatement and testing to take approximately 3-5 days to complete.  

Once Belfor has completed the abatement process, Facilities BSE staff will pressurize the system to investigate to locate the source of the leak, and repair.  We anticipate the repairs to take approximately 2-3 days. 

Further updates will be provided once the Central Heating has been restored to the HSS building, and we appreciate your patience and understanding during these repairs. 

If you have any questions or concerns, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

The service desk may be reached at facilities@sfsu.edu, or 415-338-1568.

Science - Domestic Cold Water Shutdown | Saturday October 1, 2022 - 7:00 a.m. - 1:00 p.m.

Posted September 30, 2022 @ 9:30 a.m.:

Facilities has scheduled a domestic-cold water shutdown for the Science building on Saturday 10/1/22 from 7:00 am – 1:00 pm. This shutdown is needed to swap out a broken valve in the basement so we can schedule further repairs to the back-flow preventer.

If you have any questions or concerns about this shutdown, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

Gym DCW Shutdown & GYM 121 Pool shutdown | Maintenance 

Posted September 29, 2022 @ 11:23 a.m.:

Please see the following shutdowns scheduled for the Gymnasium to perform maintenance and repairs.  

  • GYM 121 pool shutdown, to replace leaking compressed air lines, and to change DE from Friday 9/30/22 at 7:00 am through Monday 10/3/22 10:00 am
  • Domestic Cold-Water shutdown for the GYM, to replace a shut off valve, angle stop and flush valve in GYM T201 on Saturday 10/1/22 from 7:00 am – 1:00 pm. 

We apologize for any inconvenience and appreciate your patience and understanding during these repairs.

If you have any questions or concerns, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

Crane work - Central Plant  | Monday, 9/19/22 - 7:00 a.m. - 5:00 p.m.

Posted September 15, 2022 @ 4:18 p.m.:

As part of Facilities on-going Central Plant heating hot water project, Facilities has scheduled crane work on Monday, September 19, 2022, from 7:00 am – 5:00 pm. The crane will be staged on the road between the Lot 20 garage and Central Plant.

Facilities is working with contractor Sheedy Crane to lift metal water piping on the roof of Central Plant. 

We apologize for any inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns, please contact Project Manager Anthony Benson at abenson@sfsu.edu.

*Update* | Contractor Work - Road Closure | Campus Hot Water Loop Project 

Posted September 14, 2022 @ 11:39 a.m.:

Contractor SBAY has requested to extend the Cox Stadium Road closure through Monday, 10/10/22, for safety and to ensure completion of work. The road will remain closed for 24 hours a day through this scheduled date. (See the attached map for alternate routes).

  • The road leading to COX stadium will be closed 24 hours a day, through 10/10/22.

We appreciate your patience and understanding during this project.  If you have any questions or concerns, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

Hensill Hall 3rd Floor sliding doors | Update 

Posted September 6, 2022 @ 4:40 p.m.:

Please be advised: The 3rd floor exterior sliding doors at Hensill Hall are repaired and back in service.

We apologize for any inconvenience and appreciate your patience while these repairs were being completed.

If you have any questions or concerns about these repairs, please contact Structural Maintenance Manager Carl Wind at carlwind@sfsu.edu.

**Update** Contractor Activity | Gas shut-off | 9/1/22 from 7:00 am - 5:00 pm  

Posted September 1, 2022 @ 1:16 p.m.:

Update: Contractor SBAY has replaced a portion of the gas line and successfully diverted the gas feed to the Central Plant.  The gas has been restored to all affected buildings as of 11:00 am today.

If you have any questions concerning this project, please contact Project Manager Anthony Benson at abenson@sfsu.edu, or 415-680-4707.

Contractor Activity | Gas shut-off | 9/1/22 from 7:00 am - 5:00 pm

Posted August 29, 2022 @ 10:53 a.m.:

Facilities is working with a 3rd party contractor on the next phase of the Central Plant project, and the contractor is planning to shut off the gas on Thursday, 9/1/22 from 7:00 am to 5:00 pm. This shut off is required to relocate a gas line in the road leading down to Cox Stadium.

Please note that there may be an interruption of gas in the following buildings listed below:

  • Business
  • Gymnasium
  • Burk Hall

If you have any questions or concerns about this project, please contact Project Manager Anthony Benson at abenson@sfsu.edu or 415-680-4707.

Contractor Activity | Central Plant Project - Monday 8/29/22 from 8:00 am - 5:00 pm

Posted August 24, 2022 @ 3:43 p.m.:

As part of Facilities on-going campus Central Plant heating hot water project, Contractor SBAY will bring concrete trucks and heavy machinery on campus.  This is scheduled to take place on Monday, 8/29/22 from 8:00 am – 5:00 pm. Four to five concrete trucks will use South State Drive towards the road leading to COX Stadium to access the Central Plant.

Facilities staff will be present to monitor the traffic in the affected areas. There will also be on-site contractor staff with flags directing traffic at 5 corners and the bridge leading to Lot 20.

We apologize for the inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns about this project, please contact Project Manager Anthony Benson at abenson@sfsu.edu or 415-680-4707.

Contractor Work - Road Closure | **Extended through 9/19/22 - 24 hour closure

Posted August 18, 2022 @ 8:44 a.m.:

Contractor SBAY has notified us that there is a delay in receiving materials as it relates to the campus heating hot water loop project. Therefore, the Cox Stadium Road closure has been extended through Monday, 9/19/22.

The road will remain closed for 24 hours a day through this scheduled date. (See the attached map for alternate routes).

  • Road leading to COX stadium will be closed 24 hours a day, through 9/19/22.

We appreciate your patience and understanding during this project.  If you have any questions or concerns, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

Notice of Water Service Interruption | Residents of 235 Buckingham Way (UPN Block 6)

Posted August 16, 2022 @ 2:18 a.m.:

Please be advised that there is an ongoing interruption to water service in the kitchens at the above addresses. The interruption began at approximately 11 AM on Tuesday, August 16th and will be out until further notice.

There will still be both hot and cold water available in the restrooms

This is part of an urgent repair project.

Thank you for your cooperation and understanding while this work is being performed.

The Facilities Service Center can be reached at 415-405-0579 or facilities@sfsu.edu

Contractor Activity | Skylight Repair - Cesar Chavez Student Center | Tuesday 8/16/22 - 7:00 a.m. - 3:30 p.m. 

Posted August 15, 2022 @ 2:54 p.m.:

Please be advised that Facilities has scheduled service with a 3rd party vendor UCAL to replace the broken skylights in the Cesar Chavez Student Center (CCSC).  This is scheduled to take place on Tuesday, 8/16/22 from 7:00 am – 3:30 pm.  A JLG lift will be staged at Malcom X Plaza, and UCAL will work on the north-side of CCSC, near the book store.  For safety purposes, Facilities staff will also safety cone and caution tape the area directly below where UCAL will be working and will be present during this work. 

We apologize for the inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns about this project, please contact Structural Manager Carl Wind at carlwind@sfsu.edu, or Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

Weekend Work | Early Childhood Education Center (ECEC) | Saturday 8/13/22 - 7:00 am - 3:00 pm

Posted August 12, 2022 @ 1:33 p.m.:

Please be advised that Facilities will be working in the Early Childhood Education Center (ECEC) on Saturday 8/13/22, from 7:00 am – 3:00 pm.  Campus Locksmiths have coordinated with ECEC to install new panic hardware on the north-side exterior fire exit door towards State Dr.

If you have any questions or concerns about this install, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

Contractor Work - Road Closure | **Extended through 8/17/22 - 24 hour closure 

Posted August 9, 2022 @ 9:34 a.m.:

The Cox Stadium road closure has been extended through Wednesday, 8/17/22  to provide additional time to shore dig.

  • Road leading to COX stadium will be closed 24 hours a day, through 8/17/22.

We appreciate your patience and understanding during this project.  If you have any questions or concerns, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

Service Interruption Update | HSS Building - Central Heating Unavailable

Posted July 28, 2022 @ 1:12 a.m.:

Update:  Full repairs to the HSS Building are now estimated to take about 2 weeks.  Facilities has scheduled abatement removal with a 3rd party contractor to ensure that campus trades can safely work in the affected area of the HSS Building.  The abatement removal process will take approximately 1.5 weeks. Then, once the abatement removal is completed, Facilities BSEs will remove and replace a section of heat pipe.

An additional update will be provided once the central heating has been restored to the HSS Building.

If you have any questions or concerns, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

Service Interruption | HSS Building - Central Heating Unavailable

Posted July 27, 2022 @ 4:42 p.m.:

Facilities crews discovered a leak in a portion of heat pipe in the HSS Building. Campus BSE’s were able to isolate and stop the leak; however, there will be no heat in the HSS Building until further notice.  Repairs are currently in progress and further updates will be provided as additional information is available.   

If you have any questions or concerns, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

Elevator Service Update | Lot 20 - Elevator No. 1  

Posted July 26, 2022 @ 11:11 a.m.:

Please be advised that the South Parking Lot 20 Elevator No. 1 has been restored and is back in service.

TKE elevator adjusted the elevator door operation, installed new overhead door track covers and transferred the key switch into the new Control Operation Panel (COP).  

Contractor Work - Road Closure | 7/26/22 - 8/9/22 - 24 hr closure

Posted July 22, 2022 @ 3:54 p.m.:

As part of Facilities on-going campus heating hot water loop project with contractor SBAY.  Please be advised of the following road closure below (See the attached map for alternate routes).

  • Road leading to COX stadium will be closed 24 hours a day, starting on Tuesday, 7/26/22 through 8/9/22.

We appreciate your patience and understanding during this project.  If you have any questions or concerns, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

The Facilities service desk may be reached at facilities@sfsu.edu, or 415-338-1568.

CPDC planned Electrical Outage - 8/6/22 7:00 a.m. - 5:00 p.m, 8/7/22 7:00 a.m. - 4:30 p.m. 

Posted July 21, 2022 @ 10:57 a.m.:

Due to many comments and remarks from our Colleagues, CPDC requested DPR (General Contractor) to review and accelerate its work in order to achieve the power shut off during the weekend of August 6th and 7th, instead of working days.  Based on reached agreement Capital Planning Design and Construction (CPDC) has rescheduled an electrical power shutdown for Science, Hensil Hall, Thornton Hall, Student Health Center and Towers Residence on Saturday August 6, 2022, from 7:00 a.m. – 5:00 p.m. and Sunday August 7, 2022, from 7:00a.m. – 4:30p.m.  This shutdown is necessary to connect New Science Building to the campus electrical system.  The contractors involved in this work is DPR, and Rosendin Electric.  Facilities will assist CPDC and contractor as needed.  The contractor will make all attempts to minimize disruption.  Attached is a logistics plan for upcoming activities. 

If you have any questions or concerns about this shutdown, please contact Director of Construction & Inspection Boris Nemirovskiy at borisn@sfsu.edu.

Domestic Cold Water Shutdown | Marcus Hall - Saturday, 7/23/22 from 7:30 a.m. - 2:30 p.m.

Posted July 20, 2022 @ 2:07 p.m.:

Facilities has scheduled a domestic-cold water shutdown for Marcus Hall on Saturday July 23, 2022, from 7:30 am – 2:30 pm.  This shutdown is needed to install isolation / shut off valves for the 3rd and 4th floor drinking fountains, and to replace the filters.  

If you have any questions or concerns about this shutdown, please contact Facilities Coordinator Jason Deang at jdeang@sfsu.edu.

255 BW Elevator - Out of service | Friday, 7/15/22 

Posted July 14, 2022 @ 2:32 p.m.:

Please be advised that the elevator for 255 Buckingham Way will be out of service on Friday, 7/15/22 starting at 6:30 am.  We anticipate restoring service by Tuesday, 7/19/22 mid-afternoon. 

265 Buckingham Way elevator is available and may be used during this outage.

UPN 225 BW Elevator restored | UPN 235 BW Elevator restored

Posted July 14, 2022 @ 2:27 p.m.:

Please be advised that TKE Elevator was able to restore service earlier than anticipated. The following elevators listed below are back in service.

  • UPN 225 Buckingham Way Elevator
  • UPN 235 Buckingham Way Elevator  

We appreciate your patience and understanding while this work was being performed. 

Elevator Update | UPN 225 BW | 7/14/22   

Posted July 13, 2022 @ 6:09 p.m.:

Please be advised that UPN 225 Buckingham Way Elevator Service will be restored on Thursday, July 14 at the end of the business day.  TKE is test running the elevator car to ensure smooth elevator operation after the traction car was re-roped and received a new elevator governor and tail sheave.

Annual Elevator State Inspection | Marcus Hall Elevator #1 (Out of service) - July 18, 2022 - 7:00 a.m. - 1:00 p.m.

Posted July 13, 2022 @ 6:07 p.m.:

Please be advised that TKE Elevator and Facilities have scheduled an annual state inspection for Marcus Hall (elevator #1) on Monday July 18, 2022, from 7:00 am 1:00 pm. This elevator will be out of service until further notice.

During this test, the power to the building will not be affected and Marcus Hall passenger elevator #2 will be available for use.  Facilities and a TKE elevator technician will be on-site while the test is being performed.

If you have any questions or concerns about this testing, please contact Project Manager John Lew at johnlew@sfsu.edu.

Contractor Work | Road Closure | 7/8/22 - 7/22/22 from 6:30 am - 3:30 pm 

Posted July 7, 2022 @ 8:11 a.m.:

Map showing alternate routes.  Alt route to CY: West-side of lot 20 towards Maloney Field. Alt route for emergency vehicles: North state drive towards Cox Stadium.

Facilities is working with contractor SBAY to assist with repairs to the campus heating hot water loop.  These repairs are required to improve campus infrastructure and prevent leaks in the future. 

As a result of this work, we advise of the following road closure below (Please see the attached map for alternate routes).

  • Road leading to the COX stadium will be closed from 6:30 am – 3:30 pm (Monday – Friday) from 7/8/22 – 7/22/22

We apologize for the inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns about this project, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

Unexpected Road Closure - SBAY Friday, 7/1/22 from 7:00 a.m. - 1:00 p.m. | Road Leading to Cox Stadium

Posted July 1, 2022 @ 10:40 a.m.:

Due to unforeseen circumstances, please be advised the road leading to COX Stadium will be closed for up to 2 hours between 7:00 am – 1:00 pm.  Facilities received a late notice that contractor SBAY will be repairing the pavement at Five Corners, and the road leading to Cox Stadium.

As an alternate route to the Corporation Yard and upper campus, staff can use the road located between Maloney Field and the west-side of the Campus Parking Garage.

We apologize for the inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns about this project, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

 

Campus Generator Annual Maintenance | Cesar Chavez Student Center, Humanities, Student Health Center | Thursday 6/30/22

Posted June 30, 2022 @ 3:06 p.m.:

Facilities has scheduled service with Leete Generators for Thursday, 6/30/22.  This annual service includes a load bank test, and standard maintenance service.

Please note that power will not be affected in any of the buildings listed below while this service is being completed.    

The buildings scheduled for service are as follows:

  • Cesar Chavez Student Center – Onan 400kW (Oil Change and Full Inspection + 2-Hour Load bank)
  • Humanities Building – Kohler 125kW (2-Hour Load bank)
  • Student Health Center – Kohler 30kW (2-Hour Load bank)

If you have any questions or concerns, please contact Fire and Life Safety Manager David Abordo at dabordo@sfsu.edu

Campus Generator Annual Maintenance | Corp Yard, Library, Student Health Center | Thursday 6/22/22 

Posted June 28, 2022 @ 3:03 p.m.:

Facilities has scheduled service with Leete Generators for tomorrow, Thursday 6/23/2022.  This annual service includes a load bank test, and standard routine maintenance service.

Please note that power will not be affected in any of the buildings listed below while this service is being completed.    

The buildings scheduled for service are as follows:

  • Corp Yard – MQ 220kW (Oil Change and Full Inspection + 2-Hour Load bank)
  • J. Paul Leonard Library  – Onan 400kW (Oil Change and Full Inspection + 2-Hour Load bank)
  • Student Health Center – Kohler 30kW (Oil Change and Full Inspection)

If you have any questions or concerns, please contact Fire and Life Safety Manager David Abordo at dabordo@sfsu.edu

GYM Pool 121 - Out of service 6/30/22 | Scheduled Maintenance 

Posted June 24, 2022 @ 12:07 p.m.:

Please be advised that the GYM Pool 121, will be out of service on June 30, 2022.

Facilities is working with contractor CLA-Val to replace a pool pump valve in M7.  This service is needed to maintain the water quality in the pool and for health and safety reasons.

If you have any questions or concerns about this scheduled maintenance, please contact Project Manager John Lew at johnlew@sfsu.edu.

Campus Road Closures | PG&E & SBAY | 6/21/22 - 7/1/22

Posted June 15, 2022 @ 2:34 p.m.:

As an alternate route back to the Corporation Yard, staff can use the Maloney Field road located between Maloney Field and the west side of the Campus Parking Garage

Please be advised of the following road closures below.  (See attached map for additional details)

  • There will be a PG&E soft road-closure at the Fuel Cell from Tuesday, 6/21/22 through Friday, 6/24/22 from  6:00 am – 5:00 pm.  This closure is needed for PG&E to remove a concrete pad.  PG&E will have contractor staff available to flag vehicles through their project site.
  • There will be a SBAY road closure at the road leading down to Cox Stadium from Tuesday, 6/21/22 through Friday, 7/1/22 from 6:00 am to 5:00 pm.  This closure is needed to perform trench work across the road.

As an alternate route to the Corporation Yard and upper campus, staff can use the road located between Maloney Field and the west-side of the Campus Parking garage.

We apologize for the inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns about these road closures, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

Cesar Chavez Student Center | Crane work | Friday, June 17, 2022 - 5:00 a.m. - 10:00 a.m.

Posted June 14, 2022 @ 4:51 p.m.:

Photo of crane staged on the south side of GYM near the Burk Hall Stairs

Facilities has scheduled crane work on Friday, June 17, 2022, from 5:00 am – 10:00 am with Sheedy Crane to remove and replace the MUA equipment from the Cesar Chavez Student Center roof area above the shops of Quickly to the Halal Shop. The crane will be staged towards the south side of the GYM near the Burk Hall stairs. 

As a result of this work, there will be limited access to the vendor spaces during the times listed above.  

We apologize for the inconvenience and appreciate your patience and understanding. 

If you have any questions or concerns about this project, please contact Project Manager John Lew at johnlew@sfsu.edu.

The service desk may be reached at facilities@sfsu.edu, or 415-338-1568.

Plumbing Weekend Work - GYM - Domestic Cold Water Shutdown - Saturday, May 28, 2022 - 7:00 a.m. - 12:00 p.m

Posted May 26, 2022 @ 2:46 p.m.:

Facilities has scheduled a domestic-cold water shutdown for the GYM on Saturday May 28, 2022, from 7:00 am – 12:00 pm. This shutdown is needed to replace an angle stop in the 2nd floor GYM T201 restroom. 

If you have any questions or concerns about this shutdown, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu.

The service desk may be reached at facilities@sfsu.edu , or 415-338-1568

Campus Road Closures - PG&E (5/31 - 6/1), SBAY (5/31 - 6/3) from 6:00 am - 5:00 pm 

Posted May 24, 2022 @ 3:45 p.m.:

As an alternate route back to the Corporation Yard, staff can use the Maloney Field road located between Maloney Field and the west side of the Campus Parking Garage

Facilities advises of the following road closures below. (Please see the attached map for additional details)

  • The road behind the GYM, near the fuel cell will be closed from 6:00 a.m. – 5:00 p.m. from 5/31/22 – 6/1/22.  This closure is required for (PG&E) to remove the remaining equipment and cable at the fuel cell building.
  • The road leading to the COX stadium will be closed from 6:00 a.m. – 5:00 p.m. from 5/31/22 – 6/3/22. This closure is required for contractor (SBAY) to perform utility work and trenching.

As an alternate route to the Corporation Yard and upper campus, staff can use the road located between Maloney Field and the west-side of the Campus Parking Garage.

We apologize for the inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns about these projects, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

State Elevator Inspection | Library LRS elevator - Friday, 5/13/22 from 6:30 a.m. - 11:00 a.m.  **SCHEDULE UPDATE**

Posted May 16, 2022 @ 4:20 p.m.:

The state inspection for the Library (LRS) elevator has been re-scheduled to Tuesday, 5/24/22, from 7:00 a.m. – 11:00 a.m.

If you have any questions or concerns about this test, please contact Fire and Life Safety Manager David Abordo, at dabordo@sfsu.edu.   

State Elevator Inspection | Library LRS elevator - Friday, 5/13/22 from 6:30 a.m. - 11:00 a.m.  **Cancelled**

Posted May 16, 2022 @ 4:18 p.m.:

Please be advised that the state inspection scheduled for 5/13/22 for the Library (LRS) elevator has been cancelled.  A new scheduled date is TBD.  

If you have any questions or concerns about this test, please contact Fire and Life Safety Manager David Abordo, at dabordo@sfsu.edu.   

Additional information will be provided as it becomes available.

State Elevator Inspection | Library LRS elevator - Friday, 5/13/22 from 6:30 a.m. - 11:00 a.m.

Posted May 3, 2022 @ 3:33 p.m.:

Please be advised that TKE Elevator and Facilities have scheduled an annual state inspection for the Library (LRS) elevator on Friday, 5/13/22 from 6:30 a.m – 11:00 a.m. The elevator life safety system will be tested under the operation of the building generator.  Our in-house campus elevator technician will be on-site while the test is being performed.

Please note that during this test, the power to the building will not be affected.  All passenger elevators will be available, and the Library Retrieval System will still be operational.  

We apologize for the inconvenience and appreciate your patience and understanding during this mandatory testing.

If you have any questions or concerns about this test, please contact Fire and Life Safety Manager David Abordo, at dabordo@sfsu.edu

Campus Contractor Work - Cox Stadium Road Closure - Friday 4/29/22, from 7:00 a.m. - 12:00 p.m.

Posted April 28, 2022 @ 10:46 a.m.:

As an alternate route back to the Corporation Yard, staff can use the Maloney Field road located between Maloney Field and the west side of the Campus Parking Garage

Please be advised that the road leading down to Cox Stadium from Five Corners will be closed and unavailable on Friday, 4/29/22, from 7:00 am to 12:00 pm.   Contractor JUV will remove their trench plate, and install surveying equipment to identify dimensions for new utilities.

As an alternate route back to the Corporation Yard, staff can use the Maloney Field road located between Maloney Field and the west-side of the Campus Parking Garage. 

We apologize for the inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns about this project, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

Campus Contractor Work - Cox Stadium Road Closure - Wednesday 4/27/22, from 8:00 a.m. - 3:00 p.m.   

Posted April 25, 2022 @ 3:24 p.m.:

As an alternate route back to the Corporation Yard, staff can use the Maloney Field road located between Maloney Field and the west side of the Campus Parking Garage

Please be advised that the road leading down to the Cox Stadium from Five Corners will be blocked off on Wednesday, 4/27/22 from 8:00 a.m. to 3:00 p.m. Contractor SBAY is removing metal trench plates and filling in the trenches. 

As an alternate route back to the Corporation Yard, staff can use the Maloney Field road located between Maloney Field and the west side of the Campus Parking Garage.  

We apologize for the inconvenience and appreciate your patience and understanding during this project.

If you have any questions or concerns about this project, please contact Project Manager Anthony Benson, at abenson@sfsu.edu or 415-680-4707.

April 12, 2022: Notice of Kitchen Water Service Interruption 295 Buckingham Way 101, 201, 301, 401, 501, 601, 701, 801, & 901 10:00AM - 2:30PM

Posted April 8, 2022 @ 10:10 a.m.:

Please be advised that there will be an interruption to the hot and cold water to the kitchens in 295 Buckingham Way units 101, 201, 301, 401, 501, 601, 701, 801, & 901 on Tuesday, April 12, 2022 beginning at 10:00AM and lasting until 2:30PM. The water to the bathrooms will not be affected.

This is part of a planned repair project.

If you have any questions or concerns regarding this outage, please contact the Facilities Service Center at 415-405-0579 or facilities@sfsu.edu

Hensill Hall 3rd Floor sliding doors | Out of service 

Posted March 30, 2022 @ 3:54 p.m.:

Please be advised that the 3rd floor exterior sliding doors at Hensill Hall, are out of service.  The sliding doors have been secured and labeled with caution tape.  For alternative entry and exit options, please use the east side doors and the west side doors on the 3rd floor. As an alternative ADA option, please use the 2nd floor west side ADA accessible doors.  Unfortunately we do not have an estimated time to complete this repair, however additional details will be provided once available.

We apologize for the inconvenience and appreciate your patience and understanding during these repairs.

If you have any questions or concerns about these repairs, please contact Structural Maintenance Manager Carl Wind at carlwind@sfsu.edu.

April 6 - May 15: Notice of Annual Fire System Testing in Housing Buildings 9:00AM - 3:00PM

Posted March 30, 2022 @ 3:30PM

Please be advised that the annual fire system testing will take place on all Housing managed buildings between April 6 and May 19, 2022. The Testing will take place between 9:00AM and 3:00PM. Please refer to the schedule below. Our fire system vendor (ADT) will need to enter all rooms with fire detection equipment and will be escorted by SFSU Facilities staff. The inspection and testing will take approximately 5 minutes in each room. The strobes and horns will also be activated for short periods during this inspection.

  • April 6 - April 8: Mary Park Hall, Mary Ward Hall, Seven Hills Conference Center, City Eats Dining Center
  • April 18 - April 22: Village at Centennial Square: Buildings A, B, & C
  • April 25 - April 29: Towers Junior Suites, Towers at Centennial Square
  • May 9 - May 11: University Park North High Rise Buildings
  • May 16 - May 19: University Park North Garden Apartments

If you have any questions or concerns regarding this work, please reach out to David Abordo dabordo@sfsu.edu or The Facilities Service Center at 415-405-0579 or facilities@sfsu.edu

Annual Campus-wide Fire Extinguisher Inspections  - 4/1/22 - 4/12/22 

Posted March 29, 2022 @ 2:33 p.m.:

Fire and Life Safety Manager David Abordo and vendor (Ace Fire Equipment & Service) have scheduled annual fire extinguisher inspections.  These inspections are throughout the entire campus and will begin on (Friday, April 1st through Tuesday, April 12th.)  We will be checking for any outdated fire extinguishers and replacing them as needed.  

The inspection schedule is as follows:

April 1st

  • Thornton Hall, Hensill Hall, Temp buildings and Greenhouse.

Week of April 4th – 8th

  • Monday: Parking Garage of Administration building, HSS, and Business.
  • Tuesday: Library, Creative Arts, & Humanities
  • Wednesday: Burk Hall, SSB, Student Health Center, and Ethnic Studies.
  • Thursday: Fine Arts, GYM, Field House, Press Box, Warehouse, and Science
  • Friday:  Corporation Yard, Annex I, Annex II, Children’s Campus, Lot 20, Central Plant, and Waste Center

Week of April 11th – 12th

  • Monday: Mashouf Wellness Center, and Marcus Hall.
  • Tuesday: Burk Hall to replenish spares and any remaining locations that were not serviced.

If you have any questions or concerns about these scheduled inspections, please contact Fire and Life Safety Manger David Abordo dabordo@sfsu.edu.

April 5, 2022: Notice of Water Service Interruption 400-460 Winston Drive 10:00AM - 2:00PM

Posted March 29, 2022 @ 11:55AM

Please be advised that there will be an interruption to the hot and cold water service at 400-46- Winston Drive on Tuesday, April 5 beginning at 10:00AM and lasting until 2:00PM.

This is part of a planned maintenance project.

If you have any questions or concerns regarding this outage, please contact the Facilities Service Center at 415-405-0579 or facilities@sfsu.edu

March 22, 2022: Notice of Water Service Interruption 225-235 Buckingham Way 10:00AM - 5:00PM

Please be advised that there will be an interruption to the hot and cold water service at 225 & 235 Buckingham Way on Tuesday, March 22 beginning at 10:00A and lasting until 5:00PM.

  • 225 Buckingham Way will be without hot AND cold water.
  • 235 Buckingham Way will be without hot water only. Residents will still have cold water.

This is part of a larger urgent repair project.

If you have any questions or concerns regarding this outage, please contact the Facilities service Center at 415-405-0579 or facilities@sfsu.edu

Plumbing Weekend Work - GYM - Domestic Cold Water Shutdown - Saturday, March 19, 2022 - 7:00 a.m. - 12:00 p.m.

Posted March 17, 2022 @ 9:51 a.m.:

Facilities has scheduled a domestic-cold water shutdown for the GYM on Saturday March 19, 2022, from 7:00 a.m. – 12:00 p.m.  This shutdown is needed to replace a control valve in the 1st floor Faculty Women’s Locker Room T135.

If you have any questions or concerns about this shutdown, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu.

Generator & Fire Testing | Elevator State Inspections | SSB, VCS, MWC, Lot 20 Garage 

Posted March 16, 2022 @ 2:57 p.m.:

Facilities Services has scheduled annual elevator state inspections for SSB, VCS, MWC, and Lot 20. The elevators listed below will be unavailable for general use during the dates and times listed. There will be limited exceptions for any person(s) with ADA specific needs.

Testing is performed to simulate a power outage and to ensure that the elevator switches over to emergency generator power.  There will be a brief power outage for approximately 5 seconds when the building switches from standard power to emergency generator power.  When the building has switched to generator power, the building(s) will only have power to fire and life safety devices such as emergency lighting and fire alarm systems for approximately 5 minutes to complete the testing phase. Each building will be tested separately to minimize disruption as much as possible.  

Once the testing is complete, the power to the building will be immediately restored.  

The buildings affected and dates scheduled are as follows:

  • SSB | March 22, 2022 – 7:30 am – 10:30 am
  • Village at Centennial Square | March 22, 2022 – 7:30 am – 10:30 am
  • Mashouf Wellness Center | March 21, 2022 – 7:30 am – 1:00 pm
  • Lot 20 Garage #2| March 21, 2022 – 7:30 am – 1:00 pm

If you have any additional questions or concerns, please contact Fire and Life Safety Manger, David Abordo at dabordo@sfsu.edu.

If you have any DPRC related questions or concerns, please contact dprc@sfsu.edu, or 415-338-2472.

Admin Basement bi-parting doors repair | Update 3/14/22

Posted March 10, 2022 @ 11:18 a.m.:

The bi-parting doors in the basement of the Administration Building (Lot 1), have been repaired and are now available for use.

 

Cleaning The Gym's Air Ducts

Posted March 11, 2022 @ 12:11 p.m.:

Starting  Sunday, 3/13, at around 11:00 p.m., ACCO Engineered Systems and QualityAire Services will begin to clean the Gym’s interior air ducts. The contractor will work from 11:00 p.m. to 7:30 a.m. Sunday through Friday morning. During the day, ACCO will clean roofs air handler units Monday through Friday. The project will finish at the end of April.

If you have any questions or concerns about this project, please contact Project Manager Anthony Benson, abenson@sfsu.edu or 415-680-4707.

Burk Hall | Domestic-Cold water shutdown | Friday, March 11, 2022 - 12:00 p.m. - 8:00 p.m.

Posted March 11, 2022 @ 10:49 a.m.:

Please be advised that Facilities is scheduling an emergency domestic-cold water shutdown today Friday March 11, 2022, from 12:00 pm – 8:00 pm for the Burk Hall building. This shutdown is required to complete repairs to the leak in front of the GYM near the Memorial Grove.  The restrooms in Burk Hall will be unavailable during the time listed above and the appropriate signage will be posted.   The following restrooms will be open and available: Ethnic Studies and Psychology, Cesar Chavez Student Center, Fine Arts, Student Services Building, and the GYM.

If you have any questions about this repair, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu or 415-385-7133.

Facilities Plumbing Repairs - | March 11, 2022 7:00 a.m. - 8:00 a.m. | Domestic Cold Water 

Posted March 4, 2022 @ 2:47 p.m.:

Please be advised that Facilities has been actively working on a fix to the leak in front of the GYM near the Memorial Grove.  Part of these efforts require additional troubleshooting and as a result the buildings listed below may experience intermittent fluctuations in domestic cold water, as well as a brief domestic cold water shutdown for approximately 15 minutes tomorrow, Friday March 11, 2022, between 7:00 am – 8:00 am.

  • Cesar Chavez Student Center
  • Burk Hall

If you have any questions about this repair, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu or 415-385-7133.

Admin Basement bi-parting doors repair | Service scheduled Monday, 3/14/2022 @ 8:00 a.m.

Posted March 10, 2022 @ 11:18 a.m.:

Please be advised that Facilities has scheduled service with a 3rd party vendor UCAL to repair the bi-parting doors in the basement of Administration. Service is scheduled for Monday, 3/14/2022 at approximately 8:00 am.  UCAL anticipates this will take up to 8 hours to repair. 

If you have any questions or concerns about these repairs, please contact Structural Maintenance Manager Carl Wind carlwind@sfsu.edu, or 415-317-9205.

Campus-Wide - Fire Alarm System Update | Tuesday, 3/8/2022 from 7:30 a.m. - 2:00 p.m. 

Posted Marcy 7, 2022 @ 5:09 p.m.:

Facilities is working with a 3rd party contractor JCI to complete a campus-wide fire alarm system update, tomorrow Tuesday, 3/8/2022 from 7:30 am – 2:00 pm. 

Please be advised that there may be intermittent alarm sounds at all fire alarm control panels and annunciators during the above listed time while the update takes place.  Campus electricians will be on-site working with JCI and providing assistance as necessary.

If you have any questions or concerns, please contact Chief Engineer Steve Sekoch sekochsteve11@sfsu.edu.

Facilities Plumbing work | Quad near Memorial Grove

Posted March 7, 2022 @ 2:04 p.m.:

This image shows the alternate routes to take towards Nasser Plaza, and Cesar Chavez Student Center

Please be advised that in front of the GYM near the Memorial Grove there will be a portion of the quad that will be partially fenced in and will cause a slight pathway detour.  Facilities will be prepping this area for excavation to locate the source of an active leak. 

Refer to the attached diagram for alternate routes:

If you have any questions about these repairs, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu or 415-385-7133.

Facilities Weekend Work | HSS Building, Saturday 3/5/22 - 7:00 a.m. - 3:30 p.m.

Posted March 4, 2022 @ 2:47 p.m.:

The Facilities BSE team will be working in the HSS building on Saturday, 3/5/22 from 7:00 a.m. – 3:30 p.m, installing a new expansion tank for the heating loop in the basement of HSS.  Please note that there may be some intermittent central heating fluctuations during the above listed time.

If you have any questions or concerns about this work, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu, or 415-385-7133.

Facilities Weekend Work | Business 104, Saturday 3/5/22, Sunday 3/6/22 - 7:00 a.m. - 5:00 p.m.

Posted March 3, 2022 @ 3:28 p.m.:

Facilities is working with a 3rd party contractor (Eternal Construction) who will be working in Business 104 this weekend 3/5/22 – 3/6/22 from 7:00 am – 5:00 pm. Eternal will demo the plaster ceiling and install a T-bar ceiling as part of an on-going classroom renovation project, with additional work to be scheduled at a later date.  Please note that there may be some noise during the above listed time.

If you have any questions or concerns about this project, please contact Structural Maintenance Manager  Carl Wind at carlwind@sfsu.edu.

Facilities Plumbing Repairs - Decreased Water Pressure | March 3, 2022 7:00 a.m. - 9:00 a.m.

Posted March 2, 2022 @ 4:31 p.m.:

Please be advised that Facilities will perform some testing to locate an active leak in the quad, tomorrow, March 3, 2022 between 7:00 am 9:00 am.: 

 There may be a decrease in water pressure during the times listed above in the following locations:

  • Cesar Chavez Student Center
  • Pete’s Coffee

If you have any questions about this repair or if you experience a dramatic loss in water pressure, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu or 415-385-7133.

HSS Building | Plumbing weekend work | Saturday, 2/26/22 - 7:00 a.m. - 4:00 p.m.

Posted February 25, 2022 @ 5:49 p.m.:

Please be advised that the Facilities plumbing shop will be in the HSS Building installing a new water bottle filling station near HSS room 137, on Saturday, 2/26/22 between 7:00 am – 4:00 pm.  

If you have any questions about this project, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu.

The Facilities service desk may be reached at facilities@sfsu.edu, or 415-338-1568.

February 24, 2022: Planned Bathroom Hot Water Outage, 10:00 a.m. - 2:30 p.m.

Posted February 24, 2022 @ 9:45 a.m.:

Please be advised that there will be no hot water to the bathrooms at the following addresses on Thursday, February 24 from 10:00 a.m. until 2:30 p.m.

  • 335 Buckingham Way Units 104, 204, 304, 404, 504, 604, 704, 804, 904.

There will be no hot water to the bathrooms in these units during this time. The kitchen hot water will not be affected.

Thank you for your cooperation and understanding while this work is being performed.

If you have any questions, please contact the Facilities Service Center at 415-405-0579 or email facilities@sfsu.edu.

Facilities Weekend Work | Business 104, Saturday 2/26/22 - 7:00 am - 3:30 pm 

Posted February 23, 2022 @ 10:32 a.m.:

The Facilities Carpentry Shop will be working in Business 104 on Saturday 2/26/22 from 7:00 am – 3:30 pm. Facilities crews will work on removing the raised platform seating as part of an on-going classroom renovation project, with additional work to be scheduled at a later date. Please note that there may be some noise during the above listed time. 

If you have any questions or concerns about this project, please contact Structural Maintenance Manager Carl Wind at carlwind@sfsu.edu.

The Facilities Service Center may be reached at facilities@sfsu.edu or 415-338-1568.

HSS Building - Plumbing Domestic Cold Water Shutdown - Saturday 2/12/22 from 7:00 a.m. - 12:00 p.m. 

Posted February 11, 2022 @ 1:17 p.m.:

A domestic cold-water shutdown is scheduled for the HSS building on Saturday, 2/12/22 from 7:00 am – 12:00 pm.  This shutdown is needed to replace a broken flush valve and shutoff valve near the 3rd floor men’s restroom.

If you have any questions or concerns about this shutdown, please contact Chief Engineer Steve Sekotch at sekochsteve11@sfsu.edu.

The service desk may be reached at facilities@sfsu.edu, or 415-338-1568.

ADMIN Building Notification: Two Upcoming Projects (Elevator Modernization & Water Filling Replacement)

Posted February 3, 2022 @ 10:17 a.m.:

Please note the following work projects taking place in the Administration Building. The first work project will be the Elevator Modernization project, part of the campus-wide elevator modernization project. The second work project is the HEERF Water Filling Station Replacement project, which will take place on Administration Building 2nd—4th floors. I have included more details below, along with contacts for each project:

  • ELEVATOR MODERNIZATION PROJECT The next series of campus-wide elevator modernizations will be Administration Building (ADM) Elevator No. 3 (EL3, Breezeway) followed by ADM Elevator No. 4 (EL4, Holloway next to Data Center) beginning next week, Monday, February 7, 2022. I have been informed that crews will only work on one elevator at a time. While EL3 is being modernized EL4 will be available and vice versa. Elevators 1 and 2 will always be available during this project. I have included a diagram that identifies the various elevator work locations.

ELEVATOR WORK ADDITIONAL INFO — The scope of work conducted during daytime weekdays will involve replacing the pit lighting, elevator machine room lighting, electrical outlets, hydraulic jacks, hydraulic pump unit, elevator controller, control operation panels, roller guides, voice annunciation, hall lanterns, call buttons, smoke and heat detectors in the lobbies and elevator machine rooms, door operators and elevator recall system (automatic elevator lowering device). The benefits of elevator modernization include increased durability and reliability, improved fire and life safety features, decreased waiting times, reduced energy consumption, reduced operational cost, and reduced troubleshooting time.

  • HEERF WATER FILLING REPLACEMENT STATION PROJECT of replacing the drinking fountains with bottle filling stations on the 2nd—4th floors. Jack from Eternal construction will be replacing the units. He will start on the third floor since we already have ongoing construction. Once we know approximately how long one unit will take then we can come up with a time frame for the remaining floors. Until this work is complete, please use the water filling station on the 1st floor. 

If you have questions about the Elevator Modernization project, you may direct them to Project Manager John Lew, johnlew@sfsu.edu. If you have any questions about on-campus coordination, please contact Project Manager Anthony Benson, abenson@sfsu.edu.

 

Questions about the HEERF Water Filling Station Replacement project may be directed to Project Manager Tyler Brett, Capital Planning Design & Construction (CPDC), tbrett@sfsu.edu, or Director of Capital Project Management Maritza Delgadillo, CPDC, mdelgadillo@sfsu.edu. If you have additional questions that are Administration building-related, please email Executive Director of Administration jgar@sfsu.edu.

Maloney Field / Field House | Plumbing weekend work 1/29/22 - 7:00 am - 3:00 pm

Posted January 27, 2022 @ 2:56 p.m.:

Please be advised that the Facilities Plumbing shop will be performing a jetting service near Maloney Field on Saturday 1/29/22 from 7:00 am – 3:00 pmThis service is performed to clear the lines of any blockage and overgrown roots, and it is part of routine preventative maintenance. We ask that no vehicles park in front of the field house during the date and time listed above.  A Facilities maintenance vehicle and jetter service equipment will be staged near the field house.   

If you have any questions or concerns about this service, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu.

Burk Hall Bi-Parting doors unavailable | Service scheduled Friday, 1/21/2022 *UPDATE*

Posted January 24, 2022 @ 2:38 p.m.:

UPDATE:  Further troubleshooting, and additional parts are required to complete the repair to the Burk Hall bi-parting doors.  UCAL has scheduled a follow up visit for Wednesday, 1/26/22, at 12:00 pm. 

Additional updates will be provided as they are available.

Creative Arts | Bottle Filling Station Install | Saturday, 1/22/22 - 7:00 am - 4:00pm

Posted January 21, 2022 @ 4:23 p.m.:

Please be advised Facilities will be in the Creative Arts Building installing a new water bottle filling station near room T128, on Saturday, 1/22/22 between 7:00 am – 4:00 pm.  There may be brief domestic cold water interruptions during the time listed above.

If you have any questions about this project, please contact Chief Engineer Steve Sekoch at sekochsteve11@sfsu.edu.

The Facilities service desk may be reached at facilities@sfsu.edu, or 415-338-1568.

 

Parking Garage Painting - Saturday 1/22/22 - 1/29/22

Posted January 6, 2022 @ 4:47 p.m.:

Please be advised that Facilities is working with a 3rd party vendor to paint the Parking Garage. We request that all parking occupants avoid parking on the west-side of the parking garage until the painting is complete. 

Painting will resume on Saturday, 1/22/2022 at 7:00 am and is scheduled until Saturday, 1/29/2022. This project may be extended as weather permits.

If you have any questions or concerns about this project, please contact Project Manager Anthony Benson, abenson@sfsu.edu or (415) 680-4707.

Parking and Transportation may be reached at parking@sfsu.edu or (415) 338-1441.

The service desk may be reached at facilities@sfsu.edu or (415) 338-1568.

Burk Hall Bi-Parting doors unavailable | Service scheduled Friday, 1/21/2022 

Posted January 14, 2022 @ 3:50 p.m.:

Please be advise that the bi-parting doors in the Burk Hall building facing Fine Arts are out of service. The appropriate signage and caution tape has been posted.  Facilities has scheduled service with a 3rd party vendor UCAL and based off their latest availability, repairs are schedule for Friday, 1/21/2022.

  • For an ADA accessible alternate route, please take the south-east entrance facing the GYM.

For any questions or concerns about these repairs, please contact Structural Maintenance Manager Carl Wind carlwind@sfsu.edu, or 415-317-9205.

  

Contractor Activity | GYM Roof - Friday, 1/14/2022 - 6:00 a.m. - 3:00 p.m. 

Posted January 12, 2022 @ 2:14 p.m.:

Facilities will be working with a vendor Acco Engineering to replace a portion of a gas line located at the roof of the GYM.  Crews will weld in a 3 foot section of pipe, with additional work to be scheduled at a later date to be determined.

Work is scheduled as follows:

  • Friday, 1/14/22 between 6:00 am – 3:00 pm.

If you have any questions or concerns about this project, please contact Chief Engineer Steve Sekoch, sekochsteve11@sfsu.edu.

Admin Lot 1 Access doors unavailable | Service scheduled Tuesday, 1/11/2022 *UPDATE*

Posted January 11, 2022 @ 2:13 p.m.:

Please be advised that the Lot 1 access doors in the Administration building have been repaired and are now available for use. 

Admin Lot 1 Access doors unavailable | Service scheduled Tuesday, 1/11/2022

Posted January 7, 2022 @ 12:48 p.m.:

Please be advised that the Lot 1 access doorsleading to the Administration building are out of service.  The appropriate signage and caution tape has been posted. Facilities has scheduled service with a 3rd party vendor UCAL and based off their latest availability, repairs are scheduled for Tuesday, 1/11/2022.

  • As an alternate route, please take the ramp and enter through the north-side of the building to the bi-parting doors (facing HSS).

For any questions or concerns about these repairs, please contact Structural Maintenance Manager Carl Wind carlwind@sfsu.edu, or 415-317-9205.

If you have any DPRC related questions or concerns, please contact dprc@sfsu.edu, or 415-338-2472.

Hensill Hall | Weekend work, Air Balancing Ventilation

Posted January 6, 2022 @ 4:47 p.m.:

Facilities has scheduled preventative maintenance service with contractor ACCO Engineering to balance the air-flow ventilation system in the Hensill Hall building.

The scheduled work will be performed during the weekends, between 6:00 am – 3:00 pm on the following dates.

  • 1/8/22 – 1/9/22
  • 1/15/22 – 1/16/22
  • 1/22/22 – 1/23/22
  • 1/29/22 – 1/30/22
  • 2/5/22 – 2/6/22

If you have any questions or concerns, please contact Project Manager Anthony Benson, abenson@sfsu.edu, 415-680-4707.

Facilities Campus Contractor Activity | Burk Hall - Duct Cleaning Project  

Posted January 4, 2022 @ 11:14 a.m.:

Facilities is working with contractor ACCO Engineering to perform duct cleaning services in the Burk Hall building. ACCO will be provided with campus keys, and Facilities will partner with the appropriate personnel for access to any special rooms.

Work is scheduled as follows:

  • Thursday, 1/6/2022Friday, 1/14/2022 from 6:00 am – 2:30 pm
  • Sunday, 1/16/2022 through mid-February 2022 from 11:30 pm – 7:30 am

If you have any questions about this project, please contact Project Manager, Anthony Benson abenson@sfsu.edu or 415-680-4707.

Elevator Updates

Week ending in December 30, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of Service

 

Location: Administration, Elevator #4

Issue: Out of Service

 

Location: Lot 19 Elevator  

Issue: Out of Service

 

Location: Village at Centennial Square B 

Issue: Out of Service

Week ending in December 23, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of Service

 

Location: Administration, Elevator #4

Issue: Out of Service

 

Location: Lot 19 Elevator  

Issue: Out of Service

 

Location: Village at Centennial Square B 

Issue: Out of Service

Week ending in December 16, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

 

Location: Lot 19 Elevator  

Issue: Out of service

 

Location: Village at Centennial Square B 

Issue: Out of service

Week ending in December 9, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

 

Location: Lot 19 Elevator  

Issue: Out of service

Week ending in December 2, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in November 25, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in November 18, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in November 11, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in November 4, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

 

Week ending in October 28, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

 

Location: Towers at Centennial Square, Elevator #1

Issue: Out of service

Week ending in October 21, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in October 14, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in October 7, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in September 30, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in September 23, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Administration, Elevator #4

Issue: Out of service

Week ending in September 16, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Humanities, Elevator #2

Issue: Out of service

Week ending in September 9, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Humanities, Elevator #2

Issue: Out of service

Week ending in September 2, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Humanities, Elevator #2

Issue: Out of service

Week ending in August 26, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in August 12, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in August 5, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in July 29, 2022

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

 

Location: 255 Buckingham Way Elevator

Issue: Out of service

Week ending in July 22, 2022

Location: Lot 20

Issue: Out of service

 

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Marcus Hall, Elevator #1

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

 

Location: 255 Buckingham Way Elevator

Issue: Out of service

Week ending in July 15, 2022

Location: Lot 20

Issue: Out of service

 

Location: Creative Arts, Freight Elevator

Issue: Out of service

 

Location: Marcus Hall, Elevator #1

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

 

Location: 255 Buckingham Way Elevator

Issue: Out of service

Week ending in July 8, 2022

Location: Lot 20

Issue: Out of service

 

Location: Creative Arts, Tapia Side Elevator

Issue: Out of service

 

Location: Marcus Hall, Elevator #1

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in July 1, 2022

Location: Lot 20

Issue: Out of service

 

Location: Creative Arts, Tapia Side Elevator

Issue: Out of service

 

Location: Marcus Hall, Elevator #1

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in June 24, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in June 17, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in June 10, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in June 3, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in May 27, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in May 20, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in May 13, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in May 6, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in April 29, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

Week ending in April 22, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: 255 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in April 15, 2022

Location: Lot 20, South

Issue: Scheduled modernization project

 

Location: 225 Buckingham Way 

Issue: Out of service

 

Location: 255 Buckingham Way 

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in April 8, 2022

Location: 225 Buckingham Way, Elevator #1

Issue: Out of service

 

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in April 1, 2022

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in March 25, 2022

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Creative Arts, Tapia Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in March 18, 2022

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Creative Arts, Tapia Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in March 11, 2022

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Creative Arts, Tapia Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in March 4, 2022

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Creative Arts, Tapia Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in February 25, 2022

Location: Admin, Elevator #3

Issue: Out of service

 

Location: Creative Arts, Tapia Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in February 18, 2022

Location: Creative Arts, Tapia Side Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in February 11, 2022

Location: HSS Elevator

Issue: Out of service

 

Location: Creative Arts, McKenna Side Elevator

Issue: Out of service

 

Location: Creative Arts, Tapia Side Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in February 4, 2022

Location: HSS Elevator

Issue: Out of service

 

Location: Creative Arts, McKenna Side Elevator

Issue: Out of service

 

Location: Creative Arts, Tapia Side Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in January 28, 2022

Location: HSS Elevator

Issue: Out of service

 

Location: Creative Arts, Tapia Side Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

Week ending in January 21, 2022

Location: HSS Elevator

Issue: Out of service

 

Location: Creative Arts, Tapia Side Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

 

Location: Mary Ward Hall, Elevator #3

Issue: Out of service

Week ending in January 14, 2022

Location: HSS Elevator

Issue: Out of service

 

Location: Creative Arts, Tapia Side Elevator

Issue: Out of service

 

Location: Fine Arts, Elevator #1

Issue: Out of service

 

Notifications Archive:

202420232022 | 2021 | 2020 | 2019